Compliance Planning

Permit / Inspection Checklist Builder

Create a project-specific checklist and customize it for the local authority having jurisdiction.

V19
Important: Permit and inspection requirements vary by jurisdiction, project scope, adopted code edition and utility/agency rules. Use this as a planning checklist and confirm actual requirements with the local authority having jurisdiction.

Project Information

Jurisdiction / Authority

Build Checklist from Template

Select a project/trade template, then edit or remove anything that does not apply locally.

Permit & Inspection Checklist

Add, edit and reorder requirements for this specific project.

Total Items0
Not Started0
Scheduled / Submitted0
Corrections0
Passed / Complete0
Completion0%

Permit / Inspection Notes

Your Business
PERMIT / INSPECTION CHECKLISTPC-001
PROJECT
CUSTOMER / OWNER
PROJECT TYPE
JURISDICTION / AHJ
Total0
Corrections0
Complete0
Completion0%

Local / AHJ Notes

General Permit / Inspection Notes

This checklist is for project planning and recordkeeping. Verify actual permit, inspection, code and agency requirements with the authority having jurisdiction before performing regulated work.
Prepared / Reviewed By
Date
Project Manager / Contractor
Date
Practical tool guide

Build a checklist around the local approval process

Permit and inspection requirements depend on the jurisdiction and project. Use this checklist to organize questions, documents, responsibilities and inspection stages after confirming them with the local authority having jurisdiction.

Step by step

  1. Describe the project and select the relevant starting checklist. Treat generated items as prompts to verify, not a complete list of legal requirements.
  2. Confirm permits, drawings, responsible applicants and inspection stages with the local office. Add its contact information and written reference to your job notes.
  3. Assign owners and dates. Record the actual inspection outcome and required corrections before changing an item to approved.

Worked example

For a room remodel involving electrical changes, ask whether a permit and rough inspection are required before walls are closed. Record who will request the inspection and the required notice period. Do not assume the same sequence applies in another city.

Approval is an external event

Checking a box here does not issue a permit or approve an inspection. Keep permit numbers, approved plans and inspection records with the project. Recheck the checklist if the scope changes or a different trade becomes involved.

Can a template tell me which building code applies?

A template cannot confirm the adopted edition, local amendments, project classification or required approvals. Use the resource center to find official starting points, then verify the actual requirement locally.