Flagship Interactive Project Planner

Whole Home Designer

Build a multi-room floor plan, place openings, and turn the drawing into a live material takeoff.

V2
Trade Mode
General mode — select and arrange rooms, doors and windows.
House Plan
Select / Move
Selected room Wall Door Window
Whole-project totals

Automatic Material Takeoff

Total Floor Area0 sq ft
Paintable Wall Area0 sq ftOpenings deducted
Paint0 gal2 coats
Wall Drywall0 sheets4 × 8 sheets
Baseboard0 linear ftDoor widths deducted
Rooms / Openings0 / 00 rooms · 0 openings

Room-by-Room Breakdown

ProjectCalculated quantityBasis

Panel Schedule

Generated from the circuits assigned in Electrical mode.

CircuitDescriptionBreakerPolesCableDevicesEst. Cable

Electrical Takeoff

Estimated home-run cable lengths are measured from the nearest placed service panel to each electrical device.

Total NM-B / Romex0 ft
Electrical Devices0
Service Panels0
Suggested Service100 A
CableEstimated footageRuns
DeviceRoomCableRun

Plumbing Takeoff

Fixture counts plus estimated supply and drain materials.

Plumbing Fixtures0
Supply Pipe0 ft
Drain Pipe0 ft
Water Heaters0
FixtureRoomSupplyDrain

HVAC Takeoff

Room-by-room planning airflow and estimated duct runs.

Planning Load0 BTU/h
Approx. Tons0
Supply Airflow0 CFM
Estimated Duct0 ft
RoomAreaPlanning BTU/hTarget CFMSuppliesReturns

Framing Takeoff

Studs, plates, opening framing and sheathing from the room geometry.

Wall Studs0
Plate Lumber0 lf
Headers0
Wall Sheathing0 sheets
RoomWall TypeLumberSpacingStudsPlatesHeadersSheathing

Landscape & Site Takeoff

Hardscape, lawn, bed, fence and irrigation quantities from the site plan.

Hardscape Area0 sq ft
Concrete0 yd³
Fence0 lf
Lawn0 sq ft
ItemQuantityMaterial / Basis

Trade Takeoff

Project Summary

New Contractor Project

0 rooms 0 placed trade items
Floor Area0 sq ft
Wall Area0 sq ft
Electrical0 devices
Plumbing0 fixtures
HVAC0 items
Landscape0 items

Planning estimates only. Verify field measurements, product coverage, local code requirements, and manufacturer specifications before ordering materials.